Commission

FAT testingClients at factory acceptance check

Most Osmoflo plants are fabricated at our large Adelaide facility prior to on-site installation. Our commissioning regimes reflect this because they allow a lot of formal commissioning to be completed before any equipment leaves our premises.

This includes thorough and full wet-testing which is carried out with the aide of a commissioning water pump set and a 250kL rainwater tank. Such practices ensure that on-site commissioning is minimised and site acceptance testing can focus on fine tuning to meet local conditions.